Petrol desulphurization plant

Fuel desulphurization plant

  • Area: Industrial.

  • Client: Astra Evangelista.

  • Place: Montevideo

  • Status: Concluded.

Detailed enginnering, provision and construction of a gasoil desulphurization plant, of a petrol desulphurization plant, and a sulfur recovery plant in Ancap refinery.

  • Characteristics:

    • Buildings: 5,850 m2.
    • Metallic structure: 380 tons.
    • Reinforced concrete: 11,300 m3.
    • Concrete pavements: 15,000 m2.
    • Soil movements: 88,600 m3.
    • Piles: 1,570.
    • Equipment assembly: 2.500 tons.
    • Piping assembly: 1.200 tons.
    • Welding: 75.200 inches.
    • Installed Power: 2,600 kW.
    • LV and MV wire laying: 90,000 m.